Sanding a commercial floor around a business that keeps trading

Night work, staged areas and a coating that is walkable by Monday. How commercial jobs get scheduled.

Timber floor through an open living area with doors to a patio

Offices, churches, retail fitouts and body corporate jobs have a constraint houses do not: the building has to keep working.

Night and weekend work

Most commercial sanding happens outside trading hours. A floor sanded on Friday evening and coated across Saturday and Sunday is walkable by Monday morning if the coating is right and the building is warm enough.

That schedule depends on a water based system. Synteko Nova Best XC is rated for high traffic commercial use, is low odour, and recoats fast enough to get three coats down across a weekend. A solvent system cannot do that, and the smell would keep the building empty into the following week.

Full cure for heavy traffic and for putting furniture back takes longer than the walk on time, so the first week back needs some care even though the space is usable.

Staging by area

Where a weekend is not enough, the job gets split. We work one zone at a time with hoarding or barriers, finish it, and move on.

That takes longer overall and costs more, because setting up and packing down happens repeatedly instead of once. It is often still cheaper than closing.

Planning the stages around how people move through the building matters more than dividing it into equal areas. A zone that blocks the only route to the fire exit or the lift is not a zone.

Dust and the rest of the building

Commercial buildings share air. A ducted HVAC system will distribute fine dust through every floor if it is running while we sand, so it needs shutting down or isolating for the zone, and that is a conversation with the building manager before the job rather than during it.

Sealing at the boundary of the work area does the rest. Where a tenant next door has sensitive equipment or a clean requirement, tell us early.

Compliance

Commercial sites need a site specific safety plan, inductions where the building requires them, and public liability cover at the level the building manager asks for. We carry that and will provide documentation before the job.

Buildings from before the mid 1980s need the same care about vinyl and adhesive as any old house. Testing happens before removal, not after.

What to tell us at quote stage

The trading hours, and whether they are negotiable. Lift access and booking arrangements. Where the machines can be parked and loaded. Whether there is a building manager whose approval is needed. What the floor is over, since a commercial slab and a suspended timber floor are different jobs.

Any noise restrictions in the title or the body corporate rules, which in an apartment building are usually stricter than the council’s.

Getting a price

Commercial quotes take a site visit. There is too much that depends on access, hours and staging for a photograph to settle it. Paul will come and walk the space, and the written scope will name the staging and the hours it assumes, so there are no arguments later about what was allowed for.

Get an answer on your own floor

Ring Paul or send him an email. He quotes every job himself, so you get the answer from the person who would do the work.

Get My Free Quote Talk to Paul Today

No obligation. Call Paul or send him an email.